ZTT ± 400kV Flexible DC Submarine Cable, Fully Served the "Super Project" of China Three Gorges Corporation

2020/3/5 15:33:50 人评论 次浏览

font:

Recently, China Three Gorges Corporation announced the official start of a number of major new energy projects. Among them, Jiangsu Rudong 800MW (H6 #, H10 #) offshore wind power project in which ZTT is involved in construction, is one of the “Super Projects” with the largest capacity and investment in these projects.

如东海上风电项目-2.jpg

It is reported that Jiangsu Rudong 800MW (H6 #, H10 #) project is the first ± 400kV flexible DC transmission offshore wind power project in China. The DC submarine cable has a transmission distance of about 100 kilometers, which is currently the highest voltage flexible DC submarine cable with the longest transmission distance in China.

如东海上风电项目-1.jpg

This ± 400kV flexible DC submarine cable is precisely the first in the world to be successfully developed by ZTT with the support of the China Three Gorges Corporation in 2019. It breaks through technical bottlenecks such as low-crosslink system soft joints and the world's highest cable operating voltage of 1235kV. It has passed the technical appraisal by China Electricity Council and the Jiangsu Industry and Information Technology Department, reaching the international leading level.

In addition, in order to serve this "Super Project", ZTT cable ships like Zhongtian 7, Zhongtian 8, Zhongtian 9, and “Yuanwei No. 8” and “Zhongtian 5” built by Shanghai Yuanwei Construction Engineering Co., Ltd., which is under ZTT, are fully responsible for laying 220kV and 35kV submarine cables for Rudong H6 # wind farm, and for the foundation construction and hoisting of 100 sets of wind turbines.

如东海上风电项目-3.jpg

At present, ZTT has concentrated all resources to carry out epidemic prevention and resumption work to fully ensure the completion of the construction of the Three Gorges New Energy Rudong Offshore Wind Power Project in accordance with the original schedule.