Jiangsu Zhongtian Technology Co., Ltd. (600522) issued an announcement on the evening of December 17, and its wholly-owned subsidiary, Zhongtian Technology Ocean Engineering Co., Ltd. (Referred to as "ZTT Offshore Engineering") received a letter of acceptance from the Three Gorges International Tendering Co., Ltd. The "Notice of Winning the Bid" confirmed that ZTT Offshore Engineering is the successful bidder for the first batch of wind turbine foundation and installation projects (I bid section) of Three Gorges New Energy Jiangsu Rudong 800MW (H6, H10) offshore wind power project, with a bid amount of about 1.80 billion yuan.
As an important part of ZTT's marine equipment industry, ZTT Offshore Engineering has become one of the pillar industries. Owning the professional ship machinery and equipment, such as hoisting and piling boats, are equipped with the advanced level in the industry. Since being put into operation in January 2019, ZTT Offshore Engineering has participated in the construction of 8 offshore wind power projects, quickly becoming a new force in the offshore wind power construction industry.
The Three Gorges New Energy Jiangsu Rudong 800MW (H6, H10) offshore wind power project is the third general contracting project won by ZTT Offshore Engineering this year, and it is also the first time to win the bid for the "Contracting, lifting and applying" integrated contracting project. According to reports, in September, ZTT also won the bid of the Three Gorges New Energy Jiangsu Rudong 800MW (H6, H10) offshore wind power project DC power cable procurement and laying project, further showing ZTT's comprehensive strength in the marine equipment field.